Designed for the people who

actually have to make it work.

  • Cities & Municipalities

    No need for vacuum trucks or specialized crews

    Serviceable in 15 minutes with a shop vac

    Meet stormwater, trash capture, and TMDL requirements

    Reduce pollutant loads before they hit downstream systems

    Avoid deep excavation, utility conflicts, and costly change orders

    Install in less than a week — not months

    Lower long-term O&M with simple, predictable servicing

    Result: Cleaner water, less disruption, and real progress toward climate resilience goals.

  • Civil & Environmental Engineers

    A shallow, modular pre-treatment device engineered to make your designs easier — not harder.

    Only 18 inches deep — avoid utility lines and tight corridors

    Minimal excavation (1.1 cubic yards vs 105+ for central systems)

    Compatible with multiple filtration media

    Clear CAD details, spec sheets, and O&M documentation available

    Reliable performance: TSS, petroleum, and phosphorus reduction

    Result: A practical, spec-friendly solution engineers can trust and actually design around.

  • Contractors & Developers

    A stormwater install that fits real project constraints without blowing up your schedule or budget.

    Minimal excavation — ~1.1 cubic yards instead of massive underground vaults

    Shallow depth (18 inches) avoids utility conflicts and costly redesigns

    Straightforward construction — installs with standard equipment and no specialized crews

    Fast installation timelines — often completed in under a week

    Lower total project cost compared to large centralized systems

    Easier sequencing for corridor work, phased construction, and tight urban streets

    Result: A faster, smoother install with fewer surprises — and a system that works with your site, not against it.