Designed for the people who
actually have to make it work.
-

Cities & Municipalities
No need for vacuum trucks or specialized crews
Serviceable in 15 minutes with a shop vac
Meet stormwater, trash capture, and TMDL requirements
Reduce pollutant loads before they hit downstream systems
Avoid deep excavation, utility conflicts, and costly change orders
Install in less than a week — not months
Lower long-term O&M with simple, predictable servicing
Result: Cleaner water, less disruption, and real progress toward climate resilience goals.
-

Civil & Environmental Engineers
A shallow, modular pre-treatment device engineered to make your designs easier — not harder.
Only 18 inches deep — avoid utility lines and tight corridors
Minimal excavation (1.1 cubic yards vs 105+ for central systems)
Compatible with multiple filtration media
Clear CAD details, spec sheets, and O&M documentation available
Reliable performance: TSS, petroleum, and phosphorus reduction
Result: A practical, spec-friendly solution engineers can trust and actually design around.
-

Contractors & Developers
A stormwater install that fits real project constraints without blowing up your schedule or budget.
Minimal excavation — ~1.1 cubic yards instead of massive underground vaults
Shallow depth (18 inches) avoids utility conflicts and costly redesigns
Straightforward construction — installs with standard equipment and no specialized crews
Fast installation timelines — often completed in under a week
Lower total project cost compared to large centralized systems
Easier sequencing for corridor work, phased construction, and tight urban streets
Result: A faster, smoother install with fewer surprises — and a system that works with your site, not against it.