WHO KAI PONO IS BUILT FOR

Stormwater treatment
for the people who have to make it work.

Kai Pono is designed for municipalities, engineers, developers, contractors, and stormwater professionals who need practical treatment options that fit real sites, real infrastructure, and real maintenance requirements.

From constrained curb-line retrofits to new development and multi-stage treatment trains, Kai Pono helps project teams address trash, sediment, pollutants, site limitations, and long-term serviceability without forcing the project around a large buried structure.

Kai Pono stormwater treatment system installed in an urban curb-line application

Cities & Municipalities

Bring treatment closer to the source while keeping long-term maintenance in view.

  • Intercept trash and sediment before runoff reaches downstream infrastructure.
  • Evaluate shallow installations for existing streets and constrained public rights-of-way.
  • Keep inspection and cleanout accessible for municipal maintenance teams.

The priority: A system your team can operate over time.

Civil & Environmental Engineers

Consider a shallow, modular approach for retrofits, tight corridors, and upstream pretreatment.

  • Evaluate a nominal 18-inch-deep system against site elevations and utility constraints.
  • Match configuration and filtration media to project-specific treatment objectives.
  • Request drawings, specifications, and maintenance documentation for design review.

The priority: A treatment approach that fits the design.

Contractors & Developers

Plan stormwater installation around the realities of the jobsite.

  • Use a shallow footprint to help limit excavation and simplify site coordination.
  • Coordinate modular installation with street improvements and phased construction.
  • Review equipment needs, access, and maintenance responsibilities before work begins.

The priority: A clear installation plan with fewer surprises.

Tell us about your project.

Share your site location, drainage area, treatment goals, and key constraints. Start a conversation about where Kai Pono could fit.

Start with the site

Tell us where the water is coming from and what you need it to do.

New development, retrofit, municipal corridor, trash capture, pretreatment, or a larger treatment train. Bring us the project constraints and we’ll help you determine where Kai Pono fits.